Features
- Ultra-fast scanning, fast reconstruction, high-precision oblique CT
- Ideal for printed circuit board, BGA inspection, etc.
- Nondestructive visualization of internal structures and defects
super-high speed | High-speed scanning to data display in less than 1 minute *Time and image quality vary depending on imaging conditions. |
High Precision | Equipped with high-precision diagonal CT mechanism and high-precision table |
High magnification | Max. 1000 times (theoretical value) |
Workability | Large front door for easy sample loading/unloading and keyboard-less inspection |
Operability | Automatic door (2-way open/close), one-touch button inspection |
Stability | Industrial equipment-level reliability and durability, continuous use possible |
Expandability | Abundant Extended Functions to Meet User Needs Standard equipment: Void detection software Option: Direct CT table, VGSTUDIO installed, customer-oriented, in-line support, etc. |
Shooting example
External dimensions(mm)
Usage table
format | CTV190nFPD | |
CT scan method | oblique | |
Inspection size | 1 scan (max.) | 350 × 350 mm |
Coupled multi-stage scan (max)) | ー | |
Inspected object weight (max.) | 5kg | |
X-ray generator | Type / Tube voltage | open tube / 20~190kV |
Focal dimension or resolution | 0.5μm~ | |
X-ray camera | Scythe / Format | 150×150mm / IGZO FPD |
CT shape discrimination resolution | 1μm~ | |
magnification | max1000 ※theoretical value | |
Power Supply | Three-phase AC200V 4.5kVA | |
External dimensions (W x D x H) Excluding protrusions and monitor | Body part | 1,400×1,723×1,865mm |
Control Unit | 600×905×1,100mm | |
Peripherals | 580×920×1,590mm | |
weight | Main unit / Control / Peripherals | about 2,900kg / 250kg / 240kg |
leaky X-ray dose | Less than 1μSv/h | |
other |
|
others
- Be sure to read the "Instruction Manual" before using this product.
- There is no need for qualifications regarding the handling (operation) of this product or setting of a controlled area for the installation location.
- Notification to the relevant Labor Standards Inspection Office is required at least 30 days before the installation of this machine.