Features
High-speed X-ray CT scanner (industrial high-speed X-ray inspection device)/High-speed X-rays CT scanner
- Compatible with board-based electronics parts
- Ultra-fast scanning, fast reconstruction, high-precision eucentric
- Ideal for printed circuit board / BGA inspection, etc.
- Non-destructive visualization of internal structure and defects
super fast | Approximately 30 times high-speed scanning and high-speed reconstruction *1 |
High precision | Equipped with a high-precision eucentric mechanism and a high-precision table |
High magnification | Up to 500 times (theoretical value) |
Workability | Fast startup (within 2 minutes) |
Operability | Automatic door (opening and closing in two directions), one-touch button inspection |
Stability | Industrial equipment level reliability and durability, continuous use |
Scalability | Abundant extensions (optional) Orthogonal CT table, automated inspection, robot automation, etc |
*1:Compared to conventional CT machines in the industry (according to our research). Image quality varies depending on the shooting conditions. (Inspection is possible within about 2 minutes)
Shooting example
Outer diameter(mm)
Usage table
Model | CTV110μFPD | |
Inspectable size | diameter | 300mm |
height | 300mm | |
Inspection weight | max5kg | |
Shooting method | eucentric shooting / vertical shooting | |
Generater | tube voltage | max110kV(micro focus) |
Detector | Flat panel detector | |
Magnification | max500(theoretical value) | |
Utility | three-phase AC200V(3.5kVA) | |
External dimensions (W×D×H) | main body | 1,215mm×1,470mm×1,400mm |
control unit | 600mm×905mm×1,100mm ※excluding protrusions and monitors | |
Weight | main body | about 1,500kg |
control unit | about 250kg | |
Leaked X dose | less than 1μSv/h |
others
- Be sure to read the "Instruction Manual" before using this product.
- There is no need for qualifications regarding the handling (operation) of this product or setting of a controlled area for the installation location.
- Notification to the relevant Labor Standards Inspection Office is required at least 30 days before the installation of this machine.